Our Assignment
Our assignment was finishing works for El-Galaa Military Hospital’s Linear Accelerator Project in El-Orouba, Sheraton Al Matar, El Nozha, Cairo Governorate, Egypt. This linear accelerator located at ground floor of area 110 m2. Including demolition & dismantle works, ordinary works And all type of internal finishing (masonry, internal plaster, fair-faced Slab on Grade, Vinyl Flooring, stone floor, terrazzo tiles, gypsum-board, Gypsum Ceiling Tiles, Luminous Decorative Ceiling Tiles(sky light units),
IBE300 Beam with SWL equal 3 ton for maintenance purposes, Gypsum Axis Doors, Plastic Painting, wooden doors, Aluminum Windows, HPL Partition, MDF Partition, MDF counters, protection angle, Guard Rail, Room Name Signage, art work and advertising works) and All Electromechanical Works (Electric, Fire Fighting, HVAC, Plumbing and Linear Accelerator Cooling Works).