Our Assignment
Our assignment was the soil works, concrete skeleton and finishing works for TAQA Master Gas Station in Menouf City, Menofia Governorate, Egypt. With ground floor, service buildings and layout of area 600m2. Including ordinary works And all type of external and internal finishing (masonry, internal plaster, external plaster, dry mix external painting, insulation, fair-faced Slab on Grade, Ceramic Flooring, stone floor, ceramic tiles, Mica stone, terrazzo tiles, Plastic Painting, steel/wooden/securit/ aluminum doors, aluminum Windows, krital works, steel shed, Corrugated Sheets, PVC ceiling Panel, interlock floor, Pavement Curbstone, paving tiles, concrete fence, soft scape works and hard scape works) and All Electromechanical Works (Electric, Fire Fighting, HVAC, Plumbing, Lightning Rod System, Gas System).