Our Assignment
Our assignment was Renovation of Green Land Factory for Food Industries in 10th of Ramadan, Ash Sharqia Governorate, Egypt. With Ground Floor, First Floor, Second Floor of area 1500 m2 each Including Concrete & Steel Reinforcement the Existing Columns, Beams, Ceiling (remove ceramic tiles, remove flooring finishing layers, remove concrete cover for structural elements, apply new reinforced concrete shirt with thick 15cm, apply new steel shirt with thick 15cm, reinstall flooring finishing layers, install IBE240, install IBE300, install galvanized wire mesh) and all type of external and internal finishing (internal plaster, external plaster, dry mix external painting, ceramic tiles, sornaga tiles, Plastic Painting, epoxy painting).