Our Assignment
Our assignment is the concrete skeleton and masonry work for PHARMADAR Factory in EL-Sadat City, Menofia Gov., Egypt. With ground floor, three repeated floor, roof, upper roof, service buildings and layout with area 11100 m2 for layout and 4000 m2 for main building. And all Type of External and Internal finishing (internal plaster, external plaster, dry mix external painting, insulation, P.V.C floor, raised floor, stone floor, Stone Cladding, HDF wooden floor, ceramic tiles, porcelain tiles, mosaic tiles, gypsum board, decorative aluminum panels, Plastic Painting, epoxy paints, decorative painting, stainless steel handrails, clean partition single/double face, glass work, blexi board, wood cladding, brushed composite panels, Stone Counters, Stainless Steel Protection Angle, Guard Rail, art work, interlock floor, concrete curbs, grass floor, paving tiles, concrete fence, soft scape works and hard scape works) and All Electromechanical Works (HVAC, Electric, Fire Fighting, Fire Alarm, Plumbing, Telephone and Data).